Absorb the rejection
Take the loss fully and without denial, and resist the urge to strike back.
In practice: After a major rejection, the CEO holds the public response and meets the affected team in person first.
WCRC-GLC-11 — The Bhakti Saints
The WCRC Indrayani Resilience Model
When your work is sunk, hold steady and let it resurface.

THE MODEL
The Indrayani Resilience Model is a playbook for dignified resilience when work is rejected or devalued. The leader absorbs the blow without bitterness, keeps integrity intact and stays close to the people who are suffering, while the quality of the work makes its case over time. Rank and status carry no weight in deciding who deserves care.
Anchor teaching: जे का रंजले गांजले । त्यासि म्हणे जो आपुले ... तोचि साधु ओळखावा । देव तेथेचि जाणावा (Whoever calls the troubled and oppressed his own, know him as a true saint; know that God is right there), Tukaram Gatha, abhang 204
This is a selection of teachers linked with the Hindu tradition, not a ranking. The models offer management reflection, not religious instruction.
WCRC is not affiliated with or endorsed by any teacher or organisation discussed.
MODEL STRUCTURE
Take the loss fully and without denial, and resist the urge to strike back.
In practice: After a major rejection, the CEO holds the public response and meets the affected team in person first.
Stay true to the work and to your own conduct, with no bitterness towards critics.
In practice: The leader refuses shortcuts or attacks on critics to regain favour, and records honestly what was right and wrong in the work.
Treat the troubled and oppressed as your own; that is where the leader belongs during a setback.
In practice: When cuts or rejections land, the leader spends time with the most affected people and funds their recovery.
Care and voice do not depend on rank or status.
In practice: Recovery plans take input from every level, and frontline people get the same hearing as senior ones.
Sound work proves itself in time if it is kept and kept ready; tradition holds that Santaji Jagnade preserved Tukaram's abhangs.
In practice: Rejected work is documented and preserved, and brought back when conditions change.
TEACHING AND CONTEXT
Devotees recount that when orthodox critics objected that he had no right to explain scripture, Tukaram was made to sink his abhang notebooks in the Indrayani. He sat fasting and praying for 13 days on a stone at Dehu, and tradition holds that the notebooks floated up unharmed. Varkaris still bow to that stone, and the Shila Mandir built around it was dedicated in 2022.
God lives where the suffering are cared for: a true sadhu is one who treats the troubled as his own.
Tukaram Gatha, abhang 204 (Warkari Rojnishi edition)God knows nothing of high and low; only devotion counts.
Abhang 'उंच नीच काही नेणे भगवंत', cited in the Prime Minister's address at Dehu, 2022 (abhang number to be checked)A householder's daily life, lived truthfully and with kindness, can be bhakti.
New World Encyclopedia; Sadanand More (as given in brief)OPERATING MODEL
BENEFIT MODEL
The leader comes through rejection with credibility intact and without carrying bitterness into the next decision.
People see that leaders stand beside them when work is lost, whatever their rank.
Customers deal with a company that keeps its standards when under attack and does not cut corners to recover.
Setbacks are handled calmly and valuable work is preserved, so recovery does not start from zero.
The model shows that people whose work is devalued can respond with dignity, and that care should not follow status.
WCRC MODEL PARAMETERS
The scores describe this model's emphasis on each parameter. They are not scores for a person or organisation.
Vision Quotient2 / 5
Impact Index3 / 5
Innovation Score2 / 5
People Leadership4 / 5
Stakeholder Trust5 / 5
Resilience Factor5 / 5
Global Mindset1 / 5
THE AI AGE
Automation can devalue skilled work almost overnight; Acemoglu and Restrepo argue it always reduces the labour share in value added [1], and the WEF expects 39% of existing skill sets to be transformed or outdated by 2030 [2]. Professionals, creators and whole teams will see their work sunk, and they need a dignified way through. Heifetz and Laurie's advice to regulate distress and protect voices of leadership from below [3] fits Tukaram's refusal to rank people. A CEO who stays close to those affected keeps the trust needed for the work, and the people, to resurface.
EXECUTION
Pick the most recent piece of work that was rejected or cut, meet the people who built it in person, and ask what they need before saying anything in public.
Find out how the company has treated people and work after recent setbacks, and commit the leadership team to a different response.
Deliverable: A setback baseline covering the past year, the first entries in the archive of rejected work, and a signed setback charter.
Gate: Baseline recorded for all five KPIs, and every member of the leadership team has signed the setback charter.
Prove the full sequence on one real setback in one business unit.
Deliverable: A pilot review covering what held and what did not, with the honest record, the suggestion log and the archive entry attached.
Gate: In the pilot setback, leadership contact came before any public response, frontline suggestions were logged and some adopted, and regretted attrition in the pilot team is no worse than the baseline.
Make the setback protocol the standard way every unit responds to rejection.
Deliverable: An approved setback protocol, a trained manager group and an archive register with an owner for each item.
Gate: Every unit has either handled a real setback under the protocol or rehearsed it on a past case, and time to leadership contact is reported for each unit.
Keep resilience honest over years, so holding steady never turns into waiting for vindication.
Deliverable: An annual resilience review to the board covering the five setback KPIs and the state of the archive.
Gate: Trust after setbacks holds at or above the pre-event reading, and every archived item has had a revive, rework or close decision within the year.
sponsor: The CEO, because the model depends on the most senior person holding back the public response and being seen with the people who carried the loss.
lead: The CHRO, who owns the setback protocol, the archive register and the five KPIs.
forum: The leadership meeting reviews any active setback every month and the archive every quarter; the board receives an annual resilience review.
decision_rights: The lead can trigger the protocol, convene recovery sessions and add work to the archive; any public statement, recovery funding or decision to revive shelved work goes to the sponsor.
Weekly: During any active setback, the responsible leader spends time with the most affected team and records what they asked for.
Monthly: Recovery sessions report which frontline suggestions were adopted and which were declined, with reasons given back to the people who made them.
Quarterly: The archive review: heads go through shelved work and decide whether conditions have changed enough to bring any of it back.
Annually: The passivity check and trust comparison: archived items are tested for real improvement, and survey readings before and after each setback are compared.
The founder meets the whole team the day a major pitch, deal or product is rejected, and keeps one shared folder of shelved work with a short honest note on each item. Recovery input comes from everyone in a single open meeting.
The setback protocol is written down, the CHRO owns it, and managers are trained to run recovery sessions where every level gets the same hearing. The archive becomes a register with owners and a quarterly review.
Every business unit runs the protocol, group leaders visit the worst-hit sites in person, and the trust survey runs before and after each major event. The board receives an annual resilience review and checks that no single leader is absorbing every setback.
MEASUREMENT AND LIMITS
Departures of staff the company wanted to keep in the six months after a major rejection or cut, compared with the baseline.
Days from a setback being announced to a senior leader meeting the most affected teams in person.
Share of recovery-plan suggestions that came from non-managers, and share of those adopted.
Share of archived projects or assets later reused or relaunched, tracked over two to three years.
Survey items on leaders' ability, benevolence and integrity (Mayer, Davis and Schoorman), compared before and after the event.
RESEARCH SOURCES
The WCRC Guru Management Codex and its 27 models are proprietary WCRC models. © WCRC. All rights reserved.